| 8.5.2 FP2 |
| |
| |
| 8.5.2 |
| |
| |
| 8.5.1 FP4 |
| |
| |
| 8.5.1 FP2 |
| |
| |
| 8.5.1 |
| |
| |
| 8.0.3 |
| |
| |
| 8.0.2 FP5 |
| |
| |
| 8.0.2 FP3 |
| |
| |
| 8.0.2 FP1 |
| |
| |
|
| Agents |
| |
|
| |
|
| Calendar |
| |
|
| |
| | | GCOK7BQNRX | When performing certain actions on a C&S entry, such as accepting or declining, users will receive an error "An error occurred while saving: Note... | |
| | | PNON775HZ9 | Microsoft Outlook updates show as reschedules for added invitees. This regression was introduced in 8.0.1. | |
| | | TBAE7C6LK5 | Fixed a problem where only one missed alarm dialog was displayed, when more than one meeting had been missed. This regression was introduced in... | |
| | | NRBY7EUPEE | Fixed charset issues with CHARSETof utf8 and ENCODING of QUOTEDPRINTABLE when importing a vcs file. This regression was introduced in... | |
| | | PNON7CHJ2L | Fixed a problem where meeting time moved but in a ghost state. | |
| | | LMIL73BP4F | Updated the detection and handling of bad C&S docs to prevent them from causing
busytime corruptions or server crashes in extreme... | |
| | | JLAE7D5R8L | Fixed a problem where the calendar footer (i.e. the week counter) was not sticky. If the calendar was changed from counting days to counting weeks,... | |
|
| |