|
This scenario explains how to deploy Connections 4.0 as a side-by-side migration. This article is designed to be an end-to-end guide to deploying this type of configuration including all prerequisites.
|
ShowTable of Contents Overview
A .pdf version of this document may be downloaded from the Attachments section below.
This scenario explains how to deploy IBM Connections 4.0 as a side-by-side migration. This article is designed to be an end-to-end guide to deploying this type of configuration including all prerequisites.
1. Pre-installation tasks
2. Post-installation
3. Post-actions after installation agent
About the author
 | Xiao Jin Zho works on the Connections system verification test team and has four years' experience with Connections and six years' experience in testing. She is familiar with Connections product and other products in the ICS portfolio, including installing, configuring, administration, use and troubleshooting issues. Xiao Jin maybe reached at zhaoxjin@cn.ibm.com |
|