Technote Number: 1115608
Problem:
If the user creates a single or repeat event from 7/25/04 to 9/10/04 the
"Overflow" error will not occur when the user changes the date.
This issue has been reported to Lotus Software Quality Engineering (SPR
#JBIE5PPQMH), and is currently under investigation.
Steps to Reproduce issue, using a 6.0.1 CF1 server/client and the standard
iNotes template:
1. Create an All Day Event (single or repeat).
2. Set the beginning date to 7/25/04, for example.
3. Set the ending date to 9/10/04, for example.
4. Enter the required fields such as Subject, then select the Save & Close
button. This works fine.
5. Go back into this event and try to change the beginning date to 7/24/04;
the "Overflow" error occurs. More >
| |
|
|
|
|